Fire Suppression System

Fire Suppression System

Fire Suppression System 150 150 Paula Barham

Call for Tenders

Fire Suppression System

Reference: T/RAF137/19

Description: [wpv-autop]The European Spallation Source (ESS) Active Cells Facility (Lund, Sweden) will be used to remotely handle and process target station components before shipment to an external waste disposal facility. This work package is to procure a Fire Suppression system is to put out a fire in the Active Cells facility. [wpv-autop]

Scope of work

[/wpv-autop]
  • Design of Fire Suppression
  • Manufacture, and delivery of equipment to site in Lund, Sweden.
  • Installation and commissioning of system
[wpv-autop]

Key Requirements

[/wpv-autop]
  • Water mist system
  • Dry piping system
  • Manual hold-off required
  • Design to BS 8489
  • Validate using simulation or previous test results where possible
[wpv-autop]

Extinguishing volume

[/wpv-autop] The Active Cells is comprised of 2 cells, a processing cell and a maintenance cell. We have categorised both cells as machinery spaces.
  • Process Cell volume 12.5L x 13.8W x 13.8H (m)
  • Maintenance Cell volume 16.5L x 13.8W x 7.2H (m)
[wpv-autop]  

Issue Date: January 24, 2020

Process Stage: Invitation to Tender Released

Attachments:

Status: Ongoing

Update Date: 29/01/2020

What has been Updated: ITT has been published on Contracts Finder and the EU-Supply Portal

Register Interest

Description: [wpv-autop]The European Spallation Source (ESS) Active Cells Facility (Lund, Sweden) will be used to remotely handle and process target station components before shipment to an external waste disposal facility. This work package is to procure a Fire Suppression system is to put out a fire in the Active Cells facility. [wpv-autop]

Scope of work

[/wpv-autop]
  • Design of Fire Suppression
  • Manufacture, and delivery of equipment to site in Lund, Sweden.
  • Installation and commissioning of system
[wpv-autop]

Key Requirements

[/wpv-autop]
  • Water mist system
  • Dry piping system
  • Manual hold-off required
  • Design to BS 8489
  • Validate using simulation or previous test results where possible
[wpv-autop]

Extinguishing volume

[/wpv-autop] The Active Cells is comprised of 2 cells, a processing cell and a maintenance cell. We have categorised both cells as machinery spaces.
  • Process Cell volume 12.5L x 13.8W x 13.8H (m)
  • Maintenance Cell volume 16.5L x 13.8W x 7.2H (m)
[wpv-autop]  

Attachments:

Estimated Publication: Q4 2019

Update Date: 29/01/2020

What has been updated: ITT has been published on Contracts Finder and the EU-Supply Portal